- 2 Posts
- 261 Views
- Unit of Measure Structure is defined correctly in P41002 Unit of Measure Conversion.
- All Items in UOM Structure are defined in P46011 Work With Item Unit of Measure Definition.
2-Phase Picking Error - Unit of Measure Structure Not Determined
We use 2-phase picking for material brought to our production lines. We also use lot control.
We have situations where part of a skid of material committed to a move tag. Due to some circumstance, that entire skid of material will be picked for a different move tag using override option. JDE will give us a red warning – Unit of Measure Structure Not Determined (see screenshot below). JDE actually picks the material that is not committed leaving the material that is committed in the original location.
We have checked and item profile is setup by item
We do not get this error for standard picking, only if we are using 2-phase picking. Also, It doesn’t happen for 2-phase if we do an override and the entire quantity is committed to a different move tag. It only happens if only part of the material is committed.
Any suggestions are appreciated.
Thank you
I hope this will solve your problem. If still comes let me know.